Excavate to founding level
A test pit is cut to the design founding depth and the base is trimmed level and undisturbed, with any loosened material removed by hand.
Bearing capacity measured rather than inferred. A rigid plate is loaded in increments against a reaction load while settlement is read at each stage, producing a load settlement curve for the founding stratum itself.
Most bearing capacity figures are calculated from SPT or laboratory shear strength through a correlation. The plate load test skips the correlation. It loads the actual soil at the actual founding level and records how much it settles, which is why approving authorities and heavy plant designers often ask for it specifically.
The test is run at founding level, so the pit is excavated to the design depth first. A plate of 300 mm to 750 mm is bedded on levelled soil and loaded in increments, each held until the settlement rate falls below a set threshold. Dial gauges on independent datum bars read settlement to 0.01 mm.
The limitation is depth of influence. A plate stresses only about twice its own width of soil, so a 600 mm plate tells you about the top 1.2 metres. Where a weaker layer sits below that, the plate result must be read alongside the borehole log rather than instead of it. We say so in the report when it applies.
The sequence we follow on site and in the laboratory, and the point of each stage.
A test pit is cut to the design founding depth and the base is trimmed level and undisturbed, with any loosened material removed by hand.
Kentledge or a reaction frame anchored against the ground provides the load, with a hydraulic jack and calibrated load cell between the reaction and the plate.
The plate is bedded on a thin layer of fine sand or plaster of paris, and two or four dial gauges are mounted on datum bars founded outside the zone of influence.
Load is applied in stages of about one fifth of the estimated safe load, each held until settlement is under 0.02 mm per minute or for the specified minimum time.
The load settlement curve is plotted, ultimate load identified, and safe bearing capacity derived with the settlement criterion applied and corrected for foundation size.
Every result is reported with its method reference and the calibration status of the instrument used.
What engineers most often ask us about plate load test.
Most investigations combine several of these. We scope them together so you are not paying to mobilise twice.
Send us the location, the structure and your programme. You get a scoped quotation with the standard, the number of tests and the turnaround written into it.